How a leading snack manufacturer in Laguna, Philippines solved a complex case-routing challenge without disrupting a live production floor.
A leading snack manufacturer in Laguna, Philippines faced a logistics challenge on the packaging floor: the packaging room and the case-packing room were located far apart, with no efficient system to connect them. Product was being moved manually, creating bottlenecks and inconsistency.
The complexity increased once it became clear the line handled two different box types that required automatic segregation before reaching the packing stations. Any solution needed to route both SKUs accurately to 7 packers — without manual intervention and without disrupting the existing operation during installation.
Enabling.Win designed and installed a case conveying system that connected both rooms seamlessly. The system distributes cases in sequence, with a 2-lane SKU-based flow that automatically segregates the two box types and routes them to the correct packing stations.
This project shows that conveyor engineering isn't only about moving product up an incline — it's about solving the flow problems unique to each facility. By designing the case conveying system around the specific SKU routing logic and floor layout, Enabling.Win delivered automation that works reliably within the constraints of a live plant.
Book a free plant survey with our engineers. No obligation.
Enabling.Win
Tell us a little about you and the download is yours — we'll also know what to prepare if you ever want to talk conveyors.